The maximum head is 320 m. The upper reservoir has a capacity of approximately 1.5 millions m3.
It takes 28 hours to fill the upper reservoir.
During construction, various complaints were raised about the blasting of the upper reservoir.
Both dams were completed and the upper reservoir was filled by 2004.
When pumping water moves through the same conduits back to the upper reservoir.
Wind energy will be used to pump the water to the upper reservoir.
Let the surface of the upper reservoir be the reference elevation.
During periods of high energy demand, water is released from the upper reservoir back to the power station for generation.
The power station has an upper reservoir on the mountain top which stores the water.
Start at the parking lot and walk along the road to the upper reservoir.