The tracks were removed some time ago and have been replaced by a road which services local farmers.
The track has since been replaced, but the catenary is still missing.
After about 50 copies were made, the track was replaced with the official version.
Since March 2013, the running track is being replaced because the track's floor has worn out.
Their particular track had been replaced and didn't make the final cut of the album.
The track was eventually shut down, demolished, and replaced with a local community college.
However, after the holiday season passed, the track was replaced by another song.
During the winter of 2006-2007, the track was replaced and expanded.
In the 1950s the tracks were removed and replaced by the Queensway.
In 1919 the track of the branch line was replaced.