The track was authorized to have slot machines and installed them in 1994.
When the dam was built in 1913, tracks were installed for moving equipment and trash.
A new running track and synthetic turf field was installed.
A running track was installed at the stadium specifically for the competition.
In the mid-50s an athletic track was installed at the stadium reducing the capacity to 32,000.
The tracks can be installed onto many different types of floor and on different levels.
In 2004 a synthetic field and track was installed at the high school.
A new track and artificial turf for football/soccer were installed during the summer of 2006.
The synthetic track is called Tapeta, and was installed in the summer of 2007.
A track was also installed to allow locomotives to run.