In total, about 27,500 metric tonnes of British steel and 500,000 bolts were used during construction.
Production facilities have an annual capacity to produce about 200,000 tonnes of electrical steel.
Approximately 3,800 tonnes of steel were used for the roof structure.
A total of 2,000 tonnes of steel were used in the bridge's design.
The 600 tonnes of iron and steel were sold as scrap.
Approximately 2.5million tonnes of steel per year are handled by the port.
In all, 140,000 tonnes of steel was used in its construction.
Within a few years, Ravenscraig was producing more than a million tonnes of steel per year.
For the repair costing around Rs5 million about 8 tonnes of steel was used.
Over 35,000 tonnes of steel were used in construction.