This means station is planned to be opened for commercial operation in 2015.
As of August 2011, the station was planned to be launched in 2016.
The station was not planned to be a major transfer point during construction.
Three additional stations are planned for, and may be built in the future.
While constructed, the station is not planned to open before 2025.
At the time, the station was planned to open in 1979.
Two more stations are planned to be completed by May 2013.
As a result, the station was planned to be located some way to one side.
Another station in the center of the country to look south is planned for the mid-1990's, he said.
Three more stations are currently being planned or under construction.