This service was withdrawn in December 2009 because of low passenger use.
The platforms are connected by a level crossing for passenger use.
This is potentially the beginning of the necessary work required to reopen the line for passenger use.
The new building, which cost £750,000, was opened for passenger use on 16 March 2010.
Each seat bay now also has a power socket for passenger use.
In around 2004, a fifth track was converted to passenger use.
However, a goods lift has been modified for passenger use.
In 1984 the easternmost track was taken out of passenger use.
Considerable work would need to be done on the track to make it suitable and safe for passenger use.
Their ability to move under battery-power has also allowed limited passenger use.