A new footbridge was also provided, replacing the previous underpass.
Complaints have been made that the new footbridge is less usable than the one it replaced.
A new footbridge was built on the opposite side of the station from the original in mid-2011.
A new footbridge providing lift access was added during fiscal 2010.
The weir piles were then removed and a new footbridge built.
In 2003, after some delay, a new footbridge was built across the river at Bryn-y-felin.
The new footbridge and lift were opened on 12 May 2008.
Since June 2008 a new footbridge with lifts provides disabled access to platforms 2 and 3.
The new footbridge was lifted into place in the early hours of 22 January 2007.
The station also has a new footbridge as from 17 May 2009.