After the mill was taken over by Zundert, it needed serious restoration, which took place in 1961.
The mill was closed in 1978 when it needed further restoration.
By 1681 it was already in poor condition, needing restoration.
Which, even from the head of the slope, could be seen to need restoration.
It is hardly the case that the inspected film does not need digital restoration.
By 1961, the house was in poor condition and needed restoration, to the tune of $92,500.
The destroyed university and its library needed rapid restoration after the war.
However, the construction was of poor quality and the church needed substantial restoration.
In any case, many of them will need restoration.
And it will need restoration that is estimated at $1.7 million.