A new continuous caster was installed between 1998 and 2000.
The many Tiffany features were installed between 1891 and 1920.
Most of the valuable stained glass windows were installed between 1220-1230 and 1320-1370.
The center's first glass elevator was installed between the old escalators.
In December 2012 a big screen was installed between the popular side and the away end.
The Scanet train radio system was installed between 1993 and 1996.
The work will be installed between April and June 2013.
Five other monuments were installed between 1830 and 1839.
The structure was installed between a pre-war house and an apartment building.
These must be installed between the height of 10 and 60 feet.