The next year, 1983, the school was expanded to include a new gymnasium with a seating capacity of 1200, coach's offices, and an extra classroom.
It includes a multipurpose room with a capacity of 600.
The public vehicles include buses with a seating capacity greater than twelve.
The site also includes hydroelectric generators with a total capacity of 4,000 kilowatts.
This includes high school gyms with a capacity of 7,000 or greater that are confirmed to be opening in the future.
The main store includes a high end restaurant with a capacity of 120 seats.
The officials said the plant under discussion was to include several fermentation vessels with a total capacity of about 13,200 gallons.
It includes a 304 km long canal with a capacity of 84.9 cubic meter per second for irrigation.
It included three three-story buildings, with a capacity of about three hundred beds.
These buildings include a residence with a capacity of 170 students and dining facilities.