The primary purpose of the dam is hydroelectric power production.
The dam was completed in 1912 for the primary purpose of hydroelectric power production.
The purpose of the dam is hydroelectric power production using run-of-the-river technology.
The dam is intended for hydroelectric power production, flood control and navigation.
The dam was built for the purpose of irrigation, flood control and hydroelectric power production.
The lake has a dam on the northern end and the water is used for hydroelectric power production.
The lake has a dam at the northwest end, which is used for hydroelectric power production.
It was constructed for hydroelectric power production and flood control.
During the summer months, when energy rates are higher, water is released back down through the generators for hydroelectric power production.
The purpose of the dam is hydroelectric power production and flood control.