It was constructed between 1951 and 1953 for the purpose of hydroelectric power generation.
It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation.
It was constructed between 1941 and 1946 for the purpose of hydroelectric power generation.
It serves to provide water for both hydroelectric power generation and agriculture.
The primary purpose of the dam is hydroelectric power generation.
At that point, however, humans had taken a hand and the river was repeatedly used for hydroelectric power generation.
It does not serve a hydroelectric power generation or flood control function.
Water from the reservoir will be used for both irrigation development and hydroelectric power generation.
It was constructed between 1984 and 1988 for the primary purpose of hydroelectric power generation.
The main purpose of the dam is river regulation and hydroelectric power generation.