The current station with high-level platforms was built between 2000 and 2001.
The third station with high-level platforms was built between 2000-2001.
The station has two high-level side platforms, each eight cars long.
This station has two high-level side platforms each six cars long.
This station has two high-level side platforms, each long enough for one and a half cars.
This station has three high-level platforms each 12 cars long.
This station has one 12-car-long high-level side platform, north of the track.
A new station and high-level platforms were opened in October 2007.
The station has four tracks and two high-level platforms each six cars long.
The station building is partly built below the high-level platforms.