Beginning in 1910, two separate suburban tracks were laid north of the existing freight track.
In 2008, a new protected level crossing was built on the freight track at the roundabout next to the station.
Previously, there were other freight tracks, but these are out of operation.
The freight tracks are largely in place, but have been cut off from the rail network.
The former freight tracks are dismantled or no longer in operation.
Today, however, all the freight tracks have been removed.
The freight tracks were dismantled with the closure of the mine.
Old freight tracks may also be resurrected for passenger trains.
The freight tracks remained in use until the 1980s.
Initially there were two passenger tracks and a freight track at the station.