The drilling operation - in a water depth of 72 metres - is scheduled to take just over 100 days.
By then, however, the drilling operation was under way and in fact nearly completed.
By early 1907 major drilling operations began, roads and other infrastructure were built.
Products also include instruments and controls required on the rig floor for the drilling operation.
Each drilling operation is in water deeper than 900m.
Do you want to go to work on the drilling operations or digging the mines?
Is there no way you can speed up this drilling operation?
This is about 100 feet (30 m) from the site of a geothermal drilling operation that took place in 1962 and 1978.
"How difficult would it be to conceal the drilling operations?"
Generally it allows increasing the reliability and the control of the drilling operation.