The drill went according to plan until the orders became confused in translation.
One house we passed was still under construction and the drills were going for it bigtime.
"Sometimes the drill goes down along the vein and you get high concentrations," he said.
There were tests to run, drills to go through.
If the drill goes on and off, there's a loose connection in the plug.
After driving an estimated 250 of the 20mm screws, the drill was still going strong.
So far the drill was going according to form.
That drill went perfectly, and her husband talked about how impressed he was.
For a company that's about to succumb, the drill goes something like this.