The current station has been in continuous operation since 1942.
The current station is the second to serve the town.
Plans for the current station, opposite the original, were approved in late 2007.
This would have be at the location of the current station.
The current station was commissioned in 1987, but the site has been used for power generation since 1950.
However, its location is not the same as the current station.
However, none was on the site of the current station.
The current station, built in 1993, offers little more than a ticket office and a store.
The current station opened in 1985 at the same point as the original.
The current station is about one tenth of the original area.