Over 2,500 bench seats were added to the existing 2,000-seat concrete grandstand, bringing the total capacity to 4,500.
The concrete grandstand is scheduled to begin construction in 2013 with completion prior to the 2014 season.
A concrete grandstand was added in 1922 at a cost of $10,000.
Tingley Field had a 3000-seat concrete grandstand with a small pressbox which could accommodate only a few people.
Beyond the right field wall is the concrete grandstand for the track stadium.
A concrete grandstand at the finish area (southeast corner) has a seating capacity of 1,000.
A concrete grandstand at the finish line in the southeast corner seats approximately 1,000.
Following a fire in 1915, a steel and concrete grandstand was built with the plate repositioned to the northwest corner.
The same year Atlanta signed a contract with a company to built two concrete grandstands which would replace the wooden one that still stood there.
The ground has a main concrete grandstand and a total capacity of 5,000.