This match occurred before the Northern Stand was damaged and the stadium's capacity reduced.
Originally the theatre had 800 seats on 4 levels, but the gallery (top) level has since been closed and the seating capacity reduced to 656.
The main rationale for the first development of high speed rail in Japan and France was to increase capacity not reduce travel time.
The huge marshalling yard at Hamm was damaged and its capacity reduced by 75%.
The larger capacity of the cranes reduced the installation time of a platform from a whole season to a few weeks.
The stadium was refurbished in 1988 and its capacity reduced to the present-day number.
After a major recondition in 1997, capacity reduced to 10,230 (all seated).
Since then the capacity of the stadium has reduced due to safety reasons.
The stand was instead refurbished and became known as the West Stand, with the capacity reduced to 26,272.
After reconstruction capacity has reduced to 4,400.