The home at the end of the street was built about 1784.
The meeting house form building was built about 1810 during the Federal period.
The house was built about 1820 in the Federal style.
This was perhaps built in about first half of the 8th century.
Each takes around 16 hours to build costs about 20,000.
The original section of the house was built about 1815.
The house is believed to have been built about 1670.
The was built at about the same date as the house.
The church was built in 1651 and seats about 600 people.
The ship was to be built for a cost of £28,850, then about $140,500.