The bridge took three years to construct and opened on December 22, 2006.
The bridge takes less than 10 minutes to raise and lower back into place.
From the start to finish, the bridge had taken under three hours to build.
The bridge took 3 years to build at a cost of approximately £6 million.
While the real bridge took almost 20 years to build (city politics slowed the process), this one will be finished in an hour.
A bridge takes the main road over the river.
There was still no way to be sure the bridge would take the weight of the wagon.
The bridge took its final form in 1866 after the road widening.
A narrow concrete bridge takes you from one side of the pool to the other.
The bridge took two and half years to build with 6,000 full-time workers.