As a result, the company moved to Easton and the block was demolished.
The main block was demolished late in 2012.
All the blocks were later demolished between 1988 and 1992 to cope with the estate redevelopment.
At last, nearly all blocks were demolished at one time in late 1990s, rather than by phases.
The block which had contained the Hammerhouse was demolished in 2005.
The two other blocks were demolished in 1999.
The remaining three blocks were demolished on Sunday 25th September 2011, also at 11:15am.
In 1934 the camps stopped as the former naval college dormitory blocks were being demolished.
The blocks he was involved in building are being demolished to give room for modernistic city planning.
However, the two blocks were demolished as early as in 1985 because of safety concerns.