A second batch of ten locomotives followed in 1930-1931.
Between 1903 and 1907 Maffei delivered three batches of 39 locomotives in all.
A second batch of twenty locomotives was ordered from the same builders and delivered in 1922, numbered 1971 to 1990.
However, none of the original batch of ten locomotives survives.
This was followed by a third and final batch of sixty locomotives in 1958.
The first batch of 50 locomotives were delivered between February 1892 and July 1893.
The final batch of 15 locomotives, built between 1932 and 1934, were numbered 1400-1414 from new.
The second batch of four locomotives (№№ 003-006) arrived in Baranovichi on November 24, 2012.
The second batch of 12 locomotives was built with narrow bodies to allow them to work specific lines in Kent.
The first batch of four locomotives had small shunting-style headlights.