For instance, an architect has to gather knowledge, make decisions and document during the analysis phase.
In order to gain the necessary understanding of the complex system, a comprehensive data capture and analysis phase is needed.
This is part of the analysis phase in site planning.
The call graph and control flow graph are usually also built during the analysis phase.
This is the clearly defined stopping point for the analysis phase.
The analysis phase may simply be checking whether such a proposal could be expected to provide the function required.
Within this form of the design process the scheming and manufacturing processes are found to be highly dependent on the analysis phase.
The control list is constantly being revised as a result of the analysis phase.
As this argument goes, at the heart of Instructional Design is the analysis phase.
In the main analysis phase either an exploratory or confirmatory approach can be adopted.