The new system is expected to control costs and reduce large truck traffic in the city.
There will be a local increase in truck traffic when soil is brought to and from the site.
The bridge is responsible for 60-70% of commercial truck traffic in the region.
This is the most truck traffic I've ever seen here.
Back then, the idea was to bypass the truck traffic out of the city proper.
While there are plans to open the bridge to commercial truck traffic, a date has not yet been set for that to begin.
Currently about 65% of truck traffic which use the route does cross the California state line.
"It surprises me a lot, especially with all the truck traffic out here," he said.
And there are ways to reduce the impact of the truck traffic associated with these facilities.
As a result, truck traffic on those roads has soared.