It was built 1910-1915 and has a power of 480 MW.
It was inaugurated in 1982 and has a power of 72 MW.
It was open on December 19, 1933 and has the total power of 99 MW.
It was open on February 13, 1952 and has the total power of 160 MW.
The former was built between 1927 and 1938 and has a peak power of 99 MW.
After these replacements, the plant is estimated to achieve total power of 98 MW.
The plant's four furnaces have a maximum power of 22.5 MW.
The power station connected to the plant has a power of 48 MW.
The original turbine lasted for more than 30 years and produced 11 MW net power.
The tariff is available only to renewable sources producing up to 5 MW power.