Those newspaper accounts, months old, told how the diving shaft had reached the sunken Grenadier.
On July 17, the main shaft reached under the Confederate position.
The main shaft reached a depth of 82.5 metres in 1938.
The main shaft had reached a depth of 213m by 1902.
The shafts of the northernmost mine Drosen reached nearly 900 m.
Seventeen days after Floyd had entered the cave, a shaft finally reaches him.
In the middle of the room, where the penetrating shaft reached its end, stood a platform with stairs.
The second shaft also reached the Barnsley seam on 15 November 1923.
The shaft had reached him, penetrated through his philosophical harness, to his very heart.
In June 1944 the mine closed at which stage the main shaft had reached 500 feet.