Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
The apples that dropped to the ground have no salvage value at all, he said.
And loans that did sour would have higher salvage value.
Thus, he said, junk tires will have a salvage value.
However, many of these are rusted, and in some cases the salvage value is less than the cost to remove them.
"There is thus little or no salvage value for retired tuxedos."
Further to this; it is the cost of the asset less any salvage value over its estimated useful life.
The old silos had long since been sealed and nothing of any salvage value remained.
In some countries or for some purposes, salvage value may be ignored.
Court awards for a wrecking operation averaged about 25% of the salvage value.
In the event of damaged articles, any salvage value should be deducted from the settlement.
That pile consisted of the fake cathodoscope which at least had salvage value.
This has since led people to argue the legality of taking post-consumer waste for salvage value.
Salvage value is also known as scrap value or residual value.
Depreciation ceases when either the salvage value or the end of the asset's useful life is reached.
The wrecking vessels and crews that participated in the operations would then be awarded a share of the salvage value.
In such cases it would be relevant to establish whether there is any salvage value in the undamaged item(s).
The salvage value of the materials of the set offset the costs of recycling, and sometimes even positive gains.
Precious Little Salvage Value Past experience is not encouraging.
Not even salvage value.
Due to its durability, low maintenance, and ultimate salvage value, the additional cost for copper may be insignificant over the life of a roofing system.
If the waste or scrap can be sold at salvage value, this value should be subtracted from the costs in step 4.
Because of Smallbone and Moyne this was a long process since they wanted a share of the salvage value.
The salvage value is often forgotten, but is important, and is either the net cost or revenue for decommissioning the project.
Option to abandon: Management may have the option to cease a project during its life, and, possibly, to realise its salvage value.
Tellincas, Aspe, and Laca also appealed to gain a greater portion of the salvage value.