The work on road widening is expected to start after the end of monsoon in 2012.
After concerns were raised about traffic, road widening and other issues, the proposal was turned down in 1983.
Both were taken down due to road widening works in 1958.
There are proposals to move the sculpture to a new site, near its current location, to allow for road widening.
Much of its space has been lost to road widening and metro rail over the decades.
On August 16, 1962, the road widening was completed.
There was also a cemetery, but the marked graves (only) were later moved for road widening.
Arminia was asked to move their home ground for the road widening but declined.
Quickly, local politicians came on board and the road widening was stopped.
The bridge took its final form in 1866 after the road widening.