Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
These pre-engineered systems are designed per the parameters of the individual machine.
Because they are pre-engineered these fans may be available with relatively short delivery times.
The company was established in 1976 and centers its operations on Pre-engineered buildings.
Lumber will be pre-engineered from environmentally sensitive wood by products.
Building sizes are usually standardized by the nature of being a pre-engineered building.
An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%.
In 1961, the Nabholz brothers recognized a need within the industry for pre-engineered metal buildings.
This is a partial list of pre-engineered building companies:
Pre-engineered French drain systems that eliminate the need for gravel and rock have become increasingly popular since their introduction over 40 years ago.
Often, pre-engineered rotors with various blade shapes may be installed into a common housing.
After considerable success with grain bin production, the company branched out into pre-engineered buildings in 1939.
Data center modules are pre-engineered, standardized building blocks that can be easily configured and moved as needed.
As with most pre-engineered buildings, each building will be supplied with all necessary component parts to form a complete building system.
All logic and circuitry is pre-engineered, so users can play with electronics without knowing electronics.
The I beams are then field-assembled (e.g. bolted connections) to form the entire frame of the pre-engineered building.
"Actually, it's pretty comforting to us to know that there is a pre-engineered unit of that size that can be dropped into place within 18 months."
In pre-engineered buildings, the I beams used are usually formed by welding together steel plates to form the I section.
While pre-engineered buildings can be adapted to suit a wide variety of structural applications, the greatest economy will be realized when utilising standard details.
Poles make up the outer walls and support the roof system, usually pre-engineered wood trusses with a roof sheathing.
Newer pre-engineered sunroom designs must meet strict criteria to obtain building permits and product approvals through various agencies.
In general, however, Automatic Fire Suppression Systems fall into two categories: engineered and pre-engineered systems.
Pre-Engineered Fire Suppression Systems use pre-designed elements to eliminate the need for engineering work beyond the original product design.
Charles Nabholz formed Conark Builders, a merit shop general contractor focusing on pre-engineered metal building applications.
The most efficient power generation cycles are those with unfired HRSGs with modular pre-engineered components.
Nomenclature of PEB (Pre-engineered building).