Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
This year's efforts will focus on construction of the rubble mound breakwater.
The project involves the construction of a 217 m rubble mound breakwater structure.
The external pressures on the front face of a rubble mound breakwater resulting from wave attack are examined in this paper.
Rubble mound breakwaters use structural voids to dissipate the wave energy.
Good quality active wave absorption is especially important for performing long duration stability tests of rubble mound breakwaters.
River of Ponds – The rubble mound breakwater constructed last year sustained extensive damage during a severe storm this past winter.
The proposed new rubble mound breakwater structure in Lamaline will provide protection to these structures, thus providing the necessary operational requirements for facility users.
KOLOS are randomly placed on rubble mound breakwaters in two layers.
The dolosse were placed on the rubble mound breakwaters as a means of protection of the breakwaters.
As design wave heights get larger, rubble mound breakwaters require larger armour units to resist the wave forces.
The work will incorporate the existing timber crib wharf into a rubble mound breakwater and floating wharves will be added.
The harbour facility at Mamainse consists of a 95-metre timber crib and span wharf that is protected by a rubble mound breakwater to the north.
Public Works Rock mound breakwater Groves Point, Cape Breton.
A summary of the various forms of armour systems that have been employed since the early 1800's to protect rubble mound breakwaters from wave attack is presented.
This project will initiate planning and design for proposed reconstruction of the crest of the engineered rock mound breakwater located at Bella Coola.
River of Ponds – At this location, a large rubble mound breakwater will be constructed to protect the existing slipway which is currently very exposed to the elements.
The proposed project involves constructing a rubble mound breakwater approximately 60 metres in length to protect the harbour from incoming waves and create a safe environment for fishers.
Breakwater MacDiarmid Public Works Approximately 800 ft. northwesterly from recent construction of rubble mound breakwater.
Work nears completion on a major capital project at Launching Pond with the completion of a 60-metre rubble mound breakwater extension to the recently constructed south breakwater.
Black Duck Brook – This harbour on the Port au Port Peninsula consists of a small boat slipway protected by two rubble mound breakwaters.
Work under the project involves dredging a new harbour basin, constructing a rubble mound breakwater, constructing a marginal service wharf, installing floating wharves and expanding the service area.
Delft Hydraulics Laboratory (1987) - Stability of rubble mound breakwaters - Stability formula for breakwaters armoured with Accropode (report H 546).
This project involves the construction of a 57 meter ell shaped rubble mound breakwater off the end of the existing steel sheet pile structure as well as the realignment of the channel.
This detached rubble mound breakwater, located on the border of the Village of Dunnottar and the Rural Municipality of St. Andrews, is no longer used for berthing and recently suffered major damage.
The wharf reconstruction project at Robert’s Arm will be completed as will the rubble mound breakwater construction project at Cape Freels North and the slipway reconstruction project at Moreton’s Harbour.