Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
While the latter is operating under an interim consent decree with new management, the society continues to receive calls from confused donors.
A similar order will be made varying the Coal Mining Industry (Production and Engineering) Interim Consent Award, September 1990.
Although this transaction required the formal approval from the Competition Bureau, PGTL began operating with the interim consent of the Bureau in July 2005.
While requiring the formal approval of the Competition Bureau, Pacific Gateway Terminal Ltd. was formed and began operation in July 2005 with the Bureau’s interim consent.
New York State and Allied-Signal, Inc. signed an interim Consent Decree detailing the elements of a Remedial Investigation and Feasibility Study to be undertaken of the lake.
In the meantime, it has issued about 500 interim permits, including those to Telebeam.
Interim Permits will be completed in triplicate at no cost to the operator, with the distribution as follows:
Minister may grant Interim Permit. 8.
If international applicants meet the requirements they are then able to work on an interim permit, while they wait to take the Canadian Registered Nurse Examination.
Civil & Traffic Engineering An interim permit from Transit to carry out drainage works on the State Highway areas has been issued.
Ensure that you enclose a copy of the Community Care Facility Act License or Interim Permit for each centre.
However, a third of the hazardous waste incinerators operating under interim permits are closing rather than seeking final permits, which have more stringent and costly requirements (Pirages, 1989).
Meanwhile, the complainant has received her interim permit, and is now able to practise nursing under supervision, while the RNABC assesses the quality of her practice.
Managers of private security companies, who spoke anonymously to avoid endangering contracts, said they had been called into a meeting with Afghan officials to explain the process for obtaining the interim permits.
Permit Issuing Office, after issuing the necessary permit(s) will stamp the Interim Permit and return to Issuing RCMP Detachment.
Interim Permit Sought Plans to build a special pipeline to Los Angeles were dropped in 1987 because of political opposition from Los Angeles and other cities along the pipeline route.
Failure to obtain the necessary permit(s) within seven days after issuance of the Interim Permit is an offence under Section 4.04(2) of the Commercial Transport Regulations and Section 14.012 of the Motor Vehicle Act Regulations.
But further investigation by the APVMA, at the request of an unnamed industry organisation, found that a single spray of fenthion left safe levels of residue on peaches and apricots after 21 days, prompting the authority to issue an interim permit for its limited use.