The bridge is about 55 metres long between the abutments, of which some 32 metres passes over water with a horizontal clearance of 3,3 metres.
It is 75 feet in length, has a horizontal clearance of 14 feet, and a vertical clearance of 13 feet and six inches.
To let large craft pass, two retractor spans retract fully to leave a horizontal clearance of 77.4 metres (254 ft).
The bascule span provided a horizontal clearance of 100 ft (30.5 m).
Due to several ramps connecting to the bridge the width varies from 38 to 45 metres, while the horizontal clearance is 26 metres throughout the entire structure.
It was 7,6 metres wide with a 5,2 metres wide roadway, and offered an horizontal clearance of 13 metres.
Gauntlet tracks can be used to provide horizontal clearance to a fixed obstruction adjacent to a track such as a cutting, bridge, or tunnel.
It is 109 meters long; offers a horizontal clearance of 12 metres; is 15 metres wide with a roadway of 10 metres.
It offers a horizontal clearance of 3,1 metres.
The bridge is 400 metres in length with a 140 metre central span and a horizontal clearance of 24 metres.