Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
To support technical work, the ship can be fitted with a 150-ton deck crane.
Several ships built recently for China used this brand of deck cranes.
These are loaded and unloaded by the deck crane.
A deck crane was used for the construction of the main span of the bridge.
The rig is equipped with two deck cranes and one knuckle boom.
It is fitted with a six-tonne hydraulic deck crane and fire fighting equipments.
A power block, usually mounted on a boom or a slewing deck crane, hauls the seine net.
The ship has two 110-ton Hagglunds deck crane pedestals mounted with twin cranes.
Instead it is reefed towards the mast, much like a curtain, thus allowing the gaff to be used as deck crane in the harbour.
When the boat arrived deck cranes dipped to seize her and haul the flat-bottomed craft to her davits.
A feature of the ships deployed on the London service was the mounting of deck cranes to facilitate speedy cargo handling.
They offer welfare and catering facilities, medical services, storage, workshops, offices, deck cranes, lifesaving and fire fighting equipment.
The capacity of the deck crane in front of the superstructure was increased to 40 tons to allow better handling of ore containers.
For much of the week, he said, concrete trucks were unable to reach the site, where four enormous deck cranes loom high above the nascent skyscraper.
Deck cranes lowered crates to them and picked up others, with a lot of shouted warriings going back and forth with the goods.
She was able to right the junk with her deck crane and dewater it, then continued her mission to deliver supplies to Naulo Point.
These were experienced seamen who managed the deck lines, deck cranes, winches, lifeboard davits, etc. on the deck.
She'd been refined in a Belfast shipyard, her hatches strengthened, her huge, forward deck crane removed, and her electronics suite upgraded and modernized.
Slings were attached to the two telescoping deck cranes used to raise and lower submersibles and survey equipment, so that groups of people could be pulled from the water.
IRISL also had an outstanding debt to SMAG for previously purchased deck cranes.
The deck equipment features two winches and two deck cranes, along with an aft A-Frame and a port side A-Frame.
As built Salvor had a 7.5-ton capcacity boom on a forward kingpost, however the kingpost and boom are being replaced by a 10,0000-pound deck crane.
These included large quantities of corrosion, faults with the deck crane and alarm system, overhauls of the propulsion, power generators, and air-conditioning, and upgrades to the communication suite.
Although consensus is that the platforms were meant for displaying statues, it has also been suggested that they may have been platforms for deck cranes used to load supplies.
Pitt stood in the shelter of a deck crane and watched as Giordino jockeyed the NUMA helicopter over the stern of the Polar Explorer.