In the early 1980s, a number of prefabricated buildings were added to allow for more beds to be provided.
Although such schools eventually become eligible for state funding, they usually begin with a single teacher in a room or prefabricated building.
The superstructure was said to be at the time the largest prefabricated building to move from Europe to any point in the world.
The building was one of the earliest prefabricated buildings in America.
As prefabricated building with a flat roof it was said to have a life span of 40 years!
After 1956 the school continued to make use of prefabricated building on the Primary school site for many years.
A. We have been here since 1960, but we only had a small prefabricated building back then.
He ran up the steps to the doorway of the prefabricated building and tried the handle.
He plans to mount an exhibition on prefabricated buildings there in the summer of 2008.
After the war, the first public housing development on the site also used prefabricated buildings.