Weitere Beispiele werden automatisch zu den Stichwörtern zugeordnet - wir garantieren ihre Korrektheit nicht.
She ran across the street and up the approach ramp.
And they did, right at the bottom of the approach ramp to the doors.
They were booming up the steep approach ramp of the Elevated.
The southern approach ramp would have been built on the surface and in a shallow tunnel.
He rocketed up an approach ramp, chrome flashing in the sun.
They skidded across the side of the approach ramp, close to the end, low, and not fast enough to rip the skirts off.
The approach ramp to the viaduct from the south is situated to the left of the R1.
To their left they could see that a single gravel track rose along an approach ramp directly beneath the battlements.
The big fieldpiece could no longer bear on the approach ramp to the bridge.
The two men had argued that the law required only that they study the impact of the bridge and its approach ramps.
Total length, including approach ramps, is 487 meters.
Original wooden approach ramps were replaced with the current ramps in 1920.
The rail yards visible behind the right field area in old photos have since been replaced by Interstate 10 and its approach ramps.
Thian stepped onto the approach ramp, excitement rising inside him.
Soldiers were moving war supplies to their battle stations, especially the parapets nearest the approaching ramp.
The lack of approach ramps meant the bridge ended in midair, rendering it useless.
Ten minutes later, he shot and killed a guy who was blowing his horn on the approach ramp to Hamilton Bridge.
Deck and approach ramps (excluding their side walls) were torn apart and replaced.
Total length is 8331 m, including approach ramps, the main bridge is 2868 m.
The approach ramps will follow a similar architectural language and will appear to float over the landscape before landing next to the river.
The original plans for the piers on the long approach ramps called for a steel lattice structure.
Length: 8331 m including approach ramps.
The bridge and many of its approach ramps were originally built with tram tracks, all of which have since been removed.
This excavation compensates for the blocking effect caused by the bridge pylons and approach ramps.
Construction began at 1600 hours, March 10, with the building of approach ramps on both shores two kilometres upstream of the bridge.