Overall Equipment Effectiveness is the uniformly accepted performance measure used in Japan and is rapidly gaining acceptance world wide.
Overall Equipment Effectiveness (OEE) is defined as the product between system availability, cycle time efficiency and quality rate.
Overall Equipment Effectiveness (OEE) has three components:
The main objective of TPM is to increase the Overall Equipment Effectiveness of plant equipment.
In addition, PackTags were designed to address OEE (Overall Equipment Effectiveness) calculations.
Similar to Overall Equipment Effectiveness (OEE), OLE measures availability, performance, and quality.
In 2003 the performance feedback component was enhanced with the addition of real time Overall Equipment Effectiveness [OEE] feedback.
OEE Overall Equipment Effectiveness training is linked to the Continuous Improvement process to provide quantification of productivity losses and improvement potential.
There is a similar Lean Manufacturing KPI called Overall Equipment Effectiveness (OEE).
Development of a Consultancy System for Overall Equipment Effectiveness Analysis (Masters by research) (Prof Grier Lin and Dr Sev Nagalingam)
Another screen gives detailed performance feedback statistics based on standard Overall Equipment Effectiveness [OEE] definitions, including the Uptime % and Speed Rating % of the current job being processed.
OEE Acronym for Overall Equipment Effectiveness, and a useful measure when using Preventative Maintenance, TPM etc. A different way of measuring a factory's activities other than the usual output measures.
Create useful information out of the raw collected data about the current status of production, like Work In Progress (WIP) overviews, and the production performance of the past period like the Overall Equipment Effectiveness or any other Performance indicator.
MES may operate across multiple function areas, for example: management of product definitions across the product life-cycle, resource scheduling, order execution and dispatch, production analysis and downtime management for Overall Equipment Effectiveness (OEE), Product Quality, or materials track and trace.