The first power station built at the site was started in 1943.
The power station is expected to come on line during 2011.
Each low power station was to cost up to $150,000 and have a range of 10 to 15 miles.
The power station was on the other side of the road.
The power station went into service between 1979 and 1983.
And he wants to work at a nuclear power station, like his father.
The decision to build the power station was taken in 1960.
The power station cost $150 million and was opened in June 2004.
But despite all this the power station may not go ahead.
Soon however from it a high performance main power station developed.